Copies of the following maps and drawings were
collected and referenced during the course of researching the monument's
administrative history. (All are now part of the monument's
administrative history research collection.) In some cases, documents
were available at more than one location; however, only one was
listed.
DATE | REF. NO. | DESCRIPTION (SOURCE) |
LOCATION OF ORIGINAL |
1870s | (none) | Expeditions of 1871, 1872, 1873 (John W. Powell surveys) | Bancroft Dec.11, |
1886 | (none) | Two Mile Run Survey (John M. MacFarlane) | Utah State Hist. Soc. |
pre-1900 conditions | (none) | Mormon Settlements along the Arizona Strip and in Arizona (Walker and Bufkin, Historical Atlas of Arizona) | Public Library |
pre-1900 conditions | (none) | Map showing early settlement and roads in Arizona (McClintock, Mormon Settlement in Arizona) | Public Library |
pre-1900 conditions | (none) | Map showing boundary changes to Utah and surrounding territories, 1850-1896 (Beck and Haase, Historical Atlas of the American West) | Public Library |
Feb.15, 1916 | (none) | Public Land Survey, T 40N, R 4W (USGS) | NPS/WRD |
1920 | (none) | National Park-to-Park Highway (NPS) | DSC Library |
April, 1921 (?) | #9897 | Kaibab Reservation, Arizona (plat map) | NARA II |
1921 (?) | #9683 | Kaibab Reservation, Arizona (Office of Indian Affairs) | NARA II |
1921 (or 1923?) | (none) | Map Showing Highways connecting
CEBR, N. Rim of GRCA, & Kaibab Forest & Railroads from which Stage Lines Operate |
BRCA, UP |
1922 | (none) | Auto Trails Map, State of Utah (Rand McNally) | UP |
Jan. 1922 | (none) | Map Showing Highways connecting BRCA, ZION, CEBR, & North Rim of the GRCA (UP) | UP |
1923 | (none) | Map Showing Roads connecting CEBR, BRCA, N. Rim of GRCA, and ZION | NARA/RM |
1923 | (none) | Utah State Trunk Lines (State Road Commission) | UP |
Feb. 1924 | (none) | Map of Transportation System and Railroad Connections of the Utah-Arizona Parks Transportation Co. (UP) | UP |
1924 | (none) | Tours of ZION, CEBR, BRCA, and GRCA (UP) | UP |
1924 | (none; Engle's 5/14/24 report) | Kaibab Reservation (BIA?) | BIA |
May 1924 | (none; Engle's5/13/24 letter) | untitled map showing "suggested public watering
place" on Kaibab Indian Reservation (Department of the Interior, US Indian Irrigation Service) | PISP |
Feb. 1924 | (none; see letter of 3/21/25) | untitled map showing roads connecting S. Utah & N. Arizona parks; road improvements, by source of funding (UP) | UP |
Feb. 1924 | (none; see letter of 3/21/25) | untitled map showing roads connecting S. Utah & N. Arizona parks; status of improvements (UP) | UP |
May 1924 | (none) | Kaibab Indian Reservation (Department of the Interior, US Indian Irrigation Service) BIA | BIA |
May 1929 | (none) | Map showing location of ZION, BRCA, BRCA, Kaibab National Forest and CEBR (UP) | UP |
1930 | (none) | Sketch Map of SW Utah and GRCA (Los Angeles Times; reprinted in ZION/BRCA circular, 1930) | ZION |
1930 | (none) | Map Showing Roads Connecting CEBR, BRCA, N. of GRCA, and ZION (ZION/BRCA circular, 1930) | DSC Library |
Nov. 1932 | (see letter of 1/7/32) | Map of Pipe Spring National Monument Showing
the Irrigation and Plant Life (hand-drawn by L. Heaton) | NARA II |
Nov. 1933 | (none) | Pipe Spring National Monument (+ division box) | NPS/WRD |
Dec. 1933 | (illegible) | General Development Plan (NPS) | NARA II |
Dec. 1933 | NM/PS-4933 | Sketch Map Showing Water Situation (NPS) | PISP |
Dec. 1933 | (none) | Sketch Map Showing Tunnel Spring (L. Heaton) | NARA II |
April 1934 | NM/PS-4936 | Boundary Survey Map (NPS) | PISP |
April 1934 | NM/PS-4937 | Topographical Sheet | DSC/TIC |
May 1934 | NM/PS-4945 | Water Division Structure (NPS) | DSC/TIC |
Oct. 1934 | NM/PS-4939 | Proposed Entrance Road (NPS) | PISP |
Jan. 1935 | NM/PS-4940 | Proposed Approach Road (NPS) | PISP |
March 1935 | NM/PS-3062 | A Western Camping Fireplace (NPS) | PISP |
May 1935 | NM/PS-4942 | Proposed Fence Improvements (NPS) | PISP |
August 1935 | NM/PS-3005 | Layout Plan & ECW Projects (NPS) | PISP |
Sept. 1935 | NM/PS-8101 | Project Plan, ECW 6th Per., Camp - DG44 (NPS) | NARA II |
Jan. 1936 | NM/PS-3001 | A PISP Master Plan cover (NPS) | NARA II |
Jan. 1936 | NM/PS-3002 | A Plan of the Monument (NPS) | NARA II |
Jan. 1936 | NM/PS-3003 | A General Development Plan (NPS) | NARA II |
Jan. 1936 | NM/PS-4947 | Headquarters Area, Utilities Layout (NPS) | NARA II |
Jan. 1936 | NM/PS-4946 | Proposed Campground Road (NPS) | PISP |
Feb. 1936 | (none) | site location of Whitmore dugout (L. Heaton) | NARA/RM |
March 1936 | NM/PS-4949 | Proposed Foot Paths (NPS) | PISP |
March 1936 | ECW Project 5 | Ditches - Diversion (NPS) | PISP |
March 1936 | NM/PS-4950 | Proposed Parking Area and Boulder Curb (NPS) | PISP |
March 1936 | NM/PS-4948 | Proposed Flood Control Ditch, Central Area (NPS) | PISP |
April 1936 | (none) | Plat Showing Location of Pipe Springs Acreage (hand-drawn; unknown author) | NARA II |
April 1936 | NM/PS-4941 | [title block not copied; depicts Public Works Projects] | PISP |
Jan. 1937 | NM/PS-3001B | PISP Master Plan cover (NPS) | NARA II |
Jan. 1937 | NM/PS-3002B | Plan of the Monument (NPS) | NARA II |
Jan. 1937 | NM/PS-3003B | General Development Plan (NPS) | NARA II |
Jan. 1937 | NM/PS-4953 | Headquarters Area, Utilities Layout (NPS) | NARA II |
April 1937 | NM/PS-4952 | Water System Study (NPS) | NARA II |
Aug. 1937 | NM/PS-5700A | Proposed Water System (NPS) | PISP |
Sept. 1937 | (none) | Temporary Garage (NPS, preliminary plans) | NARA/RM |
Jan. 1938 | NM/PS-3001C | Cover, Master Plan (NPS) | NARA II |
Jan. 1938 | NM/PS-3002C | Plan of the Monument (NPS) | NARA II |
Jan. 1938 | NM/PS-3003C | General Development Plan (NPS) | NARA II |
July 1938 | NM/PS-5701 | Headquarters Area, Utilities Layout (NPS) | NARA II |
Oct. 1938 | NM/PS-5350 | Proposed Sewage System & Septic Tank (NPS) | PISP |
Oct. 1938 | NM/PS-5351 | Proposed Concrete Culvert (NPS) | PISP |
March 1939 | NM/PS-5351 | A Proposed Slab Bridge (NPS) | PISP |
May 1939 | NM/PS-2027 | Signs, Garbage Containers, Hydrants (NPS) | PISP |
Jan. 1940 | NM/PS-3003D | General Development Plan (NPS) | DSC/TIC |
Jan. 1940 | NM/PS-3002D | Index and Key Map, Master Plan (NPS) | DSC/TIC |
Sept. 1940 | Fed.Proj.498 | A Historic American Buildings Survey, Pipe Spring Fort & Cabins (NPS) | DSC/TIC |
Jan. 1940 | NM/PS-5701 | A Utilities Layout, Headquarters Area (NPS) | DSC/TIC |
ca. 1941 | (none) | (untitled; map of Kaibab Indian Reservation) | PISP |
Jan. 1942 | NM/PS-2025B | Custodian's Residence (NPS) | PISP |
Jan. 1942 | (none) | Floor Plan of Custodian's Residence (sketch of CCC building, L. Heaton) | PISP |
May 1942 | NM/PS-2029 | Public Contact and Comfort Station (NPS) | DSC/TIC |
July 1943 | NM/PS-2032A | Gasoline and Oil House (NPS) | DSC/TIC |
Feb. 1944 | NM/PS-2031 | Utility Building (NPS) | DSC/TIC |
May 1945 (?) | NM/PS-2026 | Planting Sketch and Toilet Locations (H. Cornell, NPS) | PISP |
June 1945 | NM/PS-2029C | Contact Station (NPS) | DSC/TIC |
1946 | NM/PS-3100 | Cover, Master Plan (NPS) | DSC/TIC |
Oct. 1946 | NM/PS-2101 | Developed Area Plan (NPS) | DSC/TIC |
Nov. 1946 | NM/PS-5701B | Utilities Layout (NPS) | DSC/TIC |
1946 | (none) | Development Outline, Developed Area, Master Plan (NPS) | DSC/TIC |
1946 | (none) | Development Outline, Interpretation, Master Plan | DSC/TIC |
1947 | (unknown) | Cover, Master Plan; Development Outline (NPS) | PISP |
1948 | (unknown) | (Fort's) Existing Drainage System (NPS, as per L. Heaton sketch) | PISP (?) |
1948 | (none) | Historical Trails, Map of Utah (State of Utah) | PISP |
undated (late 1940s) | NM/PS-3101 | Index Sheet, Master Plan (NPS) | DSC/TIC |
ca. 1950 | (none) | Walks & Trails Improvement (L. Heaton) | PISP |
May 1952 | NM/PS-10,000A | Forestry - Fire Control (unknown) | PISP |
July 1953 | NM/PS-2100E | Roads & Trails Systems (NPS) | DSC/TIC |
1953 | (none) | Kaibab Indian Reservation (BIA) | BIA |
April 1956 | NM/PS-2051 | Comfort Station (NPS) | PISP |
May 1957 | NM/PS-7100 | Boundary Status Map | NARA/SB |
July 1957 | NPS/PS-002 | Map of Utility Pipelines (sketch, L. Heaton) | PISP |
Feb. 1958 | NM/PS-2101B | General Development (NPS) | DSC/TIC |
Feb. 1958 | NM/PS-3102 | Topographic Base Map (NPS) | DSC/TIC |
Feb. 1958 | NM/PS-3103 | Proposed Physical Improvements, Mission 66; added data, 1966 (NPS) | DSC/TIC |
March 1958 | NM/PS-3100A | Cover and Index Sheet, Master Plan (NPS) | DSC/TIC |
Feb. 1959 | (none) | Collection Box for Water System (NPS) | PISP |
April 1959 | NM/PS-3109A | Water System (NPS) | DSC/TIC |
May 1959 | NM/PS-3104 | Headquarters Area (NPS) | DSC/TIC |
May 1959 | NM/PS-3018B | Employee Residences (NPS) | PISP |
June 1959 | NM/PS-3104A | Trail Location [walkways] (NPS) | PISP |
1959 | (none; "fig. 1") | PISP Vicinity Map (in Zorro Bradley's report) | PISP |
Jan. 1960 | NM/PS-3110 | Site Development & Planting Plan Residences (NPS) | PISP |
August 1966 | NM/PS-2302 | [Entrance] Sign and Wayside Exhibit Plan (NPS) | DSC/TIC |
May 1967 | NM/PS-3119 | Proposed Relocation of Visitor Center (NPS) | DSC/TIC |
March 1968 | (see 3/29/68 meeting report) | Pipe Springs National Monument, Arizona (sketch map showing proposed development area) | PISP |
June 1968 | 321/80000 | Underground Power (NPS) | DSC/TIC |
July 1968 | (none) | Environmental Study Area | PISP |
July 1968 | (none) | Nature Trail/Native Grass Restoration Projects I & II | PISP |
June 1969 | 321/80001 | Water System; plan of water diversion structure (NPS) | DSC/TIC |
June 1969 | 321/80002 | Utilities Systems, As Maintained; Utilities Systems, Residential & Utility Area (NPS) | DSC/TIC |
Aug. 1969 | NM/PS-2301B | Roads & Trails Systems, As Maintained (NPS) | DSC/TIC |
May 1971 | 321/41,000 | Preliminary Design/Topography - Well Site (NPS) | DSC/TIC |
Jan. 1972 | 321/41,001 | Water Supply System (NPS) | DSC/TIC |
May 1972 | KAI-AZ/WD-4A | Plot Plan [Visitor Center & Parking Area] (NPS) | PISP |
July 1972 | NM/PS-800001 | Proposed Development (NPS) | DSC/TIC |
Nov. 1973 | (unknown) | Waysides (NPS) | PISP |
Jan. 1980 | 321/80007 | Pipe Spring [Fort] Restoration Project, 1979 (Conron & Muths) | DSC/TIC |
1980 | 321/80003 | As Maintained Roads & Trails (NPS) | PISP |
Nov. 1981 | 321/80006B | Existing Land Mgmt. & Use - Constraint (NPS) | DSC/TIC |
Jan. 1982 | 321/80012A | Site Map; residential analysis (NPS) | DSC/TIC |
Jan. 1982 | 321/80,008B | Regional Map, Pipe Spring National Monument (NPS) | DSC/TIC |
Dec. 1982 | 321/80003 | As Maintained Roads & Trails (NPS) | PISP |
1982-1983 | (none) | Tree Type and Location, Fort Area (NPS; sketch, unknown author) | PISP |
June 1988 | 321/80018A | Cattleman's Tunnel Spring Rehab; plan & profile; vault details (NPS) | DSC/TIC |
Oct. 1988 | (none) | [PISP landscape - 5 site maps with L. Heaton's hand-written notes indicating changes over time] | PISP |
Dec. 1993 | 321/20,900 | Pipe Spring National Monument (NPS) | DSC/TIC |
June 1997 | 321/80,022 | Pipe Spring National Monument, Cultural Landscape Inventory, Existing Conditions (NPS) | DSC/TIC |