National Park Service
Confinement and Ethnicity
An Overview of World War II Japanese American Relocation Sites
|
|
Appendix A
Relocation Center Drawings in Records
Group 210, National Archives, Cartographic Division (Washington,
D.C.)
Complied by Irene J. Cohen
Gila River Relocation Center
Electrical Distribution and Telephone Lines Butte Unit
Electrical Distribution and Telephone Lines Canal Unit
Gila River Project Area Plan Agricultural Development
Plan of Center Area Canal Unit (1" = 200')
Plan of Center Area Butte Unit (1" = 200')
Road System and Location Map (1" = 5,000')
Sewer System Layout
Title Page and Index
W.R.A. Construction (Site Plans with Dates and Construction Costs)
Water and Gas Distribution Butte Unit
Water and Gas Distribution Canal Unit
Granada Relocation Center
Electrical Distribution System Layout Plan (1" = 200')
Granada Relocation Area Field Map (Crops) (3" = 1 Mile; Faded Blueline)
Project Area (3" = 1 Mile)
Temporary Buildings Site Plan (1" = 200'; Contour Map)
Utility System Water Supply, Storage, and Distribution Layout (1942)
Utility System Water Supply, Storage and Distribution (1942)
Utility Systems Sewers
Heart Mountain Relocation Center
Plan of Center Area (1" = 400'; Includes Buildings)
Area Map 1" = 5000' (Dark, Hard to Read)
Map of Heart Mountain Relocation Project (1" = 2000')
Layout Plan (With Key to Roads and Buildings)
Water Supply System General Plan
Electrical Distribution System
Sewer System General Plan
Jerome Relocation Center Folder 1
(General Including Evacuee Barracks)
Administration Headquarters for MP Group
Administration Group Dormitory
Administration Group Store
Administration Building for Admin Group
Administration Group Dormitory
Denson Cemetery Layout Plan (1" = 15')
Drainage Layout
Evacuees Barracks Building Foundation Plan, Floor Plans, Sections
Evacuees Barracks Building as Built (1/4" = 1')
Evacuees Mess Hall and Kitchen (Plan, Sections, Furnishings, Elevation)
Evacuees Lavatory and Laundry (Elevation)
Evacuees Lavatory and Laundry (Plans, Details)
Evacuees Lavatory and Laundry (Plumbing)
Evacuees Lavatory and Laundry
Evacuees Mess Hall and Kitchen
Evacuees Mess Hall and Kitchen (Building Section, Long Elevation, Details)
Evacuees Lavatory and Laundry
Fire Station
Framing as Built
Garages for Administration and MP Groups, Watch Towers, Well Pump
Guard House for Military Police Group Plans, Elevation, Sections
Kitchen and Mess Hall for Admin. Groups and MP Group
Layout Plan (1" = 200'; W/building Schedule and Location Map)
Map of Land Developed by WRA Roads and Bridges, (1" = 1/2 Mile)
Military Police Barracks
Misc. Details: Typical Closet for Evacuee Barracks; Screened Ventilators, and Kitchen Store Room
Officers Quarters and Dispensary for MP Group, Plans, Elevation, Lecture Room
Piping Detail of Two Hot Water Tanks in Evacuees Lavatory and Laundry
Post Exchange
Post Office
Post Office Vault and Interior Equipment Details
Receiving Building Plans, Elevations Sections
Recreation Building for Evacuees Blocks and for Admin. Group
Refrigerated Warehouse
Refrigerated Warehouse
Refrigerated Warehouse
Typical Details for All Buildings (Sections Mostly)
Typical Details for All Buildings (Windows, Doors, Porches, Etc.)
Typical Details for All Buildings
Warehouse for Warehouse Group and Shop for Admin.
Warehouse for Admin. Group
Jerome Relocation Center Folder 2
(Hospital and Related)
Admin Building Hospital Group
Children's and Isolation Wards, Obstetrical Ward, Electrical Work
Construction Details Hospital Group
Covered Walks Hospital
Cross Sectional Details of Piping for Sewage Treatment Plant
Doctors and Nurses Quarters Plumbing, Heating, and Electrical
Doctors Quarters Plans and Elevations
Fire Stops and Covered Walk Ramp Hospital Group
Hospital Mess Plumbing and Heating Work
Hospital Boiler House Equipment Foundations
Hospital Mess Roof Truss Details
Hospital Boiler House Misc. Details
Hospital Boiler House Plans, Elevations
Hospital Boiler House and Misc. Details
Hospital Mess Plans, Elevations, Etc.
Hospital Mess Misc. Details
Isolation and Children's Ward Plans, Elevations, Section,
Hospital Group
Isolation and Children's Ward Plumbing and Heating
Laundry Building Hospital Group
Mess Building
Morgue and Disinfecting Building and Hosp. Warehouse 46
Nurses Quarters Plans and Elevations
Obstetrical Ward Plumb and Heating
Obstetrical Ward Plans and Elevations, Hospital Group
Optional Roof Truss for Hosp. Mess Hall Details, Elevation
Outpatients Building Plumb, Heating, Electrical
Outpatients Building Plans, Elevations, Section
Sprinkler System for Standard Ward Building
Sprinkler System for Isolation Ward, Children's Ward, Obstetrical Ward, Hospital
Sprinkler System for Covered Walks Hospital Group
Standard Ward Building Plumbing and Heating Plan Hospital Group
Standard Ward Plans and Elevation
Standard Ward Building Plumbling and Heating Plan (Hospital Group)
Standard Ward Plans and Elevations
Standard Ward Building Electrical Plan
Standard Ward Building Electrical Plan, Hospital Group
Steam Distribution System.
Surgery Building Plumb, Heating, Electric
Surgery Building Hospital Group (Plans, Elevation)
Well and Pump Line Installation Details
Jerome Relocation Center Folder 3
(Water, Sewage, and Utilities)
Aerial Electrical Distribution System. Neutral Grid and Grounding System
Aerial Electrical Distribution System. Pole Schedule
Aerial Electrical Distribution System. 13.2 KV. Const. Det
Aerial Electrical Distribution System Sector No. 2
Aerial Electrical Distribution System. 13.2 KV. Constr. Det.
Aerial Electrical Distribution System. Sector No. 4
Aerial Electrical Distribution System Sector No. 3
Aerial Electrical Distribution System Sector No. 1
Composite Plan Utility Distribution Sector No. 1
Composite Plan Utility Distribution Sector No. 2
Composite Plan Utility Distribution Sector No. 3
Composite Plan Utility Distribution Sector No. 4
Fire Alarm and Tel System Pole Lines
Sanitary Sewers Detailed Layout Sector No. 4 (1" = 100")
Sanitary Sewers Detailed Layout Sector No. 1
Sanitary Sewers Detailed Layout Sector No. 3
Sanitary Sewers General Layout
Sanitary Sewers Detailed Layout Sector No. 2
Sewage Treatment Plant Prelim. Sedimentation Tanks
Sewage Treatment Plant Filter Beds
Sewage Treatment Plant Final Sedimentation Tanks
Sewage Treatment Plant Sludge Digester
Sewage Treatment Plant Operation Diagram
Sewage Treatment Plant Sludge Drying Beds
Sewage Treatment Plant Sewage Pumping Station No. 1
Sewage Treatment Plant General Layout
Transformer Station Location Layout
Water Distribution System Water Pumping Station
Water Distribution System. Water Reservoir
Water Distribution System Detailed Layout Sector No. 2
Water Distribution System Detailed Layout, Sector No. 4
Water Distribution System Detailed Layout, Sector No. 3
Water Distribution System Detailed Layout, Sector No. 1
Water Distribution System General Layout
Manzanar Relocation Center
Boundary Map (4" = 1 Mi.)
Camp Layout (1" = 200', Incl. Building Legend)
Construction Plot Plan (WRA Construction, Remodeling)
Electrical System and Fire Alarm Telephone
Irrigation Map
Land Improvements (Roads, Airport, Etc; 1" = 100)
Manzanar Relocation Area (1" = 2,000"; Small Sheet)
Sanitary Sewer System
Water Distribution System
Minidoka Relocation Center
Basic Construction by U.S. Engineers: Center Plan (1" =300'; Includes Building Key and Vicinity Map)
Electrical Distribution Detail Layout
General Plan (1" = 200' Incl. Buildings, No Key)
Lateral 21.3 Location and Farm Units Served by Lateral
Minidoka Relocation Project (1" = 1/4 Mi)
W.r.a. Construction and Remodeling (1" = 300', Includes Key)
Poston Relocation Center
Canal System (1" = 2000')
Electrical Distribution
Electrical Distribution System Unit I
Electrical Distribution System Unit II
Electrical Distribution System Unit III
Hog Farm Area
Key Map WRA Colorado River Indian Reservation
Parker Warehouse Area
Poston Unit I (1" = 300')
Poston Unit II (1" = 300') and Typical Block (1" = 100')
Poston Unit III (1" = 300') and Typical Block (1" = 100')
Roads and Land Improvements (1"= 2000')
Sewer System Unit I
Sewer System Unit II
Sewer Layout Unit III
Telephone System Cables and Terminals Unit I
Telephone System Cables and Terminals Unit II
Telephone System Cables and Terminals Unit III and Typical Block (1" = 100')
Water Distribution System Unit I
Water Distribution System Unit II
Water Distribution System Unit III
Water Distribution System Parker Warehouse Area
Rohwer Relocation Center
Aerial Electrical Distribution. System. Sector No. 1
Aerial Electrical Distribution. System. Sector No. 2
Aerial Electrical Distribution. System. Sector No. 3
Aerial Electrical Distribution. System. Sector No. 4
Aerial Electrical Distribution. System. Neutral Grid and Grounding
Composite Plan Utility Distribution Sector No. 1
Composite Plan Utility Distribution Sector No. 2
Composite Plan Utility Distribution Sector No. 3
Composite Plan Utility Distribution Sector No. 4
Layout Plan and Vicinity Map (1" = 200')
Sanitary Sewers Detailed Layout Sector No. 1
Sanitary Sewers Detailed Layout Sector No. 2
Sanitary Sewers Detailed Layout Sector No. 3
Sanitary Sewers Detailed Layout Sector No. 4
Sanitary Sewers General Layout
Sewage Treatment Plant General Layout
Water Distribution System Detailed Layout Sector No. 1
Water Distribution System Detailed Layout Sector No. 2
Water Distribution System Detailed Layout Sector No. 3
Water Distribution System Detailed Layout Sector No. 4
Water Distribution System General Layout
Topaz Relocation Center
Center Plot Plan Buildings Planned
Electrical Distribution in Topaz
Hospital Water, Sewer and Sprinkler System (1" = 30')
Land, Fencing, Irrigation and Drainage
Other Investments by WRA (Structures, i.e. Playground Equipment, Flagpole)
Plot Plans for Hog Farm, Poultry Farm, Cattle Ranch
Project Map Roads, Fences, Ditches, Bridges and Culverts (1'= 1,500')
Project Map (Small Sheet, No Scale)
Project Plot Plan Water Lines
Road Layout, Elevations, Typical Sections
Sewer System
Sketch of Irrigation System Showing Culverts in Center (Small Sheet)
Staff Housing Water, Oil and Sewer Lines (1" = 30')
Streets, Parking Areas and Sidewalks, Hospital Block (1" = 10')
Streets, Parking Areas and Sidewalks in Administration and Appointed Personnel Housing Areas (1"=30')
Construction Buildings (Includes Key)
Utility Area Water, Sewer, and Road Layout
WRA Construction Map
Warehouse 109 (Large Scale)
Warehouse and MP Areas, and Typical Telephone System
Water Map (Including Detail of Water Tower)
Tule Lake Relocation Center
Camp Area Water Lines
Electrical Distribution Hog Farms and Deep Well Area
Electrical Distribution System
Master Plot Plan (1" = 300'; Includes Key to Buildings)
Master Area Plot Plan (1" = 600'; Buildings, No Key)
Sewer Lines and Manholes
Utilities Layout
wacc/74/appa.htm
Last Updated: 20-Feb-2004
|