Construction of Boulder Dam
|
|
|
Dam Approximately 200 Feet High November, 1933 (left);
Slot Through Middle of Dam . . . Note Supply Lines for Cooling Pipes (right)
|
|
Dam Columns and Galleries
|
|
Looking Down Nevada Abutment Toward Upstream Face (left); Upstream Face of Dam on Nevada Side in February, 1934 (right)
|
|
Upstream View of Dam When Approximately 300 Feet High, March, 1934
|
|
Aerial View of the Dam and Appurtenant Works at the Time of Initial
Storage of Water in the Reservoir (© Fairchild Aerial Surveys, Inc.)
|
|
The Intake Towers and Upstream Face of the Dam when the Reservoir
Surface was 225 Feet Above the Base of the Dam
|