127 miles of heavy steel sheet piling was driven in the west cofferdam by powerful steam hammers

Under powerful lights covering an area 3 miles long, work on the base of the dam went on day and night without interruption

As firm, clean bedrock was exposed, high steel trestles were built out from abutments, and from them long-arm cranes placed concrete in "lifts" 5 feet thick and 50 feet square

Inside the west cofferdam were built the base of the west power-house and part of the spillway section of the dam, with low gaps through which the river was later diverted