THE GRAND COULEE DAM (continued)
|
127 miles of heavy steel sheet piling was driven in the west
cofferdam by powerful steam hammers
|
|
Under powerful lights covering an area 3 miles long, work on
the base of the dam went on day and night without interruption
|
|
As firm, clean bedrock was exposed, high steel trestles were built
out from abutments, and from them long-arm cranes placed concrete
in "lifts" 5 feet thick and 50 feet square
|
|
Inside the west cofferdam were built the base of the west power-house
and part of the spillway section of the dam, with low gaps through which
the river was later diverted
|